Veneer wall decoration process flow

2022-07-22
  • Detail

Veneer wall decoration process flow

1, paste glazed tiles

?? Base course cleaning treatment → Plastering base ash → Brick selection → Soaking → Brick laying → Snap line → Paste standard point → Paste tiles → Pointing → Wipe the seam → Clean up

2. Paste ceramic brocade bricks

?? Clean the base → Plastering base ash → Row bricks and snap lines → Paste → Uncovering → Wipe the seam

3. Key points of construction

?? When treating the base course, all kinds of dirt on the wall should be cleaned up and watered one day in advance. The raised part of the concrete wall shall be chiseled off, and the base course shall be roughened to clean the floating ash. Or roughen with 107 glue cement mortar. After plastering the primer, when the bottom layer is 60-70% dry, arrange bricks and snap lines

?? Before formal pasting, standard points must be pasted to control the flatness of the pasted surface. During operation, the flatness should be checked with a guiding rule at any time. If it is uneven or not straight, it should be removed and re pasted

?? The tiles must be soaked in clear water for more than two hours before pasting, subject to the fact that the tiles do not bubble, take them out and dry them for use

?? In case of pipelines, lamp switches, supports of toilet equipment, etc. during paving, the whole brick must be cut and matched

?? After inlaying, wipe the surface with cotton thread, and then wipe the joint with white cement slurry

4. Precautions

?? The base course must be cleaned and free of floating soil and ash. Clean the surface of the original mortar on the old wall

?? Tiles must be soaked and dried in the shade. Because after the dry board is paved, the mortar moisture will be quickly absorbed by the board, causing the cement mortar to dehydrate, affecting its setting and hardening, and causing problems such as hollowing and shelling